WIT and SIT integrity campaigns

Every barrier on the wellhead and in the string pressure- or function-tested and recorded against its limit, with MAASP management.

Throughput
Up to three wells a day
Contract
Capped monthly fee
Framed to
ISO 16530 and API RP 90
Offshore
DNV 2.7-1 / EN 12079 lifting

APPLICATIONS

Where it is applied

  • Wellhead integrity testsTree valves, hanger and spool seals
  • String integrity testsTubing, packer and safety valve
  • Annulus pressure managementBleed-down and build-up tests
  • Rod-pumped and PCP wellsWellhead and stuffing-box integrity
  • Offshore platformsCampaigns across the well stock
  • WorkoversVerification before and after

THE QUESTION IT ANSWERS

Is every barrier on this well tested, and recorded against its limit?

One crew, one programme: every barrier element on the wellhead and in the string is pressure-tested or function-tested, and each result is recorded against its limit.

The aim is wells operated inside proven limits, with planned and unplanned deferral reduced.

What each result records

  • Pass or fail for every element
  • The test pressure and the hold time
  • The limit it was tested against
  • A record that the next campaign starts from

WHAT IT TESTS

What a WIT / SIT campaign tests

  1. 1WIT. Tree valves and seals: master, wing, swab.
  2. 2WIT. Tubing hanger, spool seals and lockdown screws.
  3. 3Annuli. Annulus outlets and gauges: A, B and C annuli.
  4. 4SIT. SCSSV function and control-line test.
  5. 5SIT. Tubing and packer: tubing-to-annulus check.
  6. 6Test. Test pump and recorder: pressure up, hold, bleed.
  7. 7MAASP. The limit the annulus must stay inside.
Wellhead and string showing the barrier elements tested in a WIT and SIT campaign, numbered one to seven
The elements tested, numbered as in the list

FIVE ELEMENTS, ONE SERVICE

Test, manage, diagnose, record

WIT

Wellhead integrity test

Tree valves, hanger and spool seals, annulus outlets, connections, lockdown screws.

SIT

String integrity test

Tubing, packer, SCSSV and control line, tubing-to-annulus communication.

MAASP

Annulus management

Annulus pressure surveys, bleed-down and build-up, MAASP derivation and limits.

LEAK

Leak-detection diagnostics

Noise and temperature logs, EM corrosion surveys: diagnosis as a core step.

DATA

Software, records, expertise

WelliRS barrier register, test programmes and a resident wellhead specialist.

HOW THE SERVICE RUNS

From the test programme to the integrity report

  1. 1Mobilise. Crews, an office engineer and a resident wellhead specialist.
  2. 2Programme. Streamlines writes the test programmes for client approval.
  3. 3Execute. WIT, SSSV tests, annulus surveys and MAASP, up to three wells a day once approvals are in place.
  4. 4Record. Results logged in WelliRS and linked to the client's SAP for work orders.
  5. 5Report. Integrity reporting, repair recommendations, greasing and maintenance.
  6. Contracting: an integrated monthly service with a capped fee, with crews, engineers, software and testing in one line. SIT is available as an optional monthly add-on. Offshore ready: DNV 2.7-1 / EN 12079 lifting, BOSIET and HUET-certified crews, POB and supply-boat planning, SIMOPS and permit-to-work, weather standby planned in.

THE WELL LIFE CYCLE

Integrity across the well life cycle

Controls, monitoring and decisions at each stage
Drilling and completionProduction and workoversSuspension and abandonment
ControlsBarrier design, completion and tree acceptance testsWIT and SIT schedules, MAASP limits, SSSV tests, greasingPermanent barriers: bridge plugs, cement, bismuth-alloy seals
MonitoringInstallation pressure tests, baseline annulus readingsAnnulus pressure trends, noise, temperature and EM surveysBarrier verification and pressure tests
DecisionHand-over to production with a verified barrier registerContinue, repair by patch or alloy seal, workover, or shut inBarrier acceptance and regulatory close-out

Every decision point is recorded in the barrier register, so the next crew inherits evidence, not assumptions.

WHERE IT FITS

Test, diagnose, repair, record

  1. TESTWIT and SIT campaign, with MAASP limits for every annulus
  2. DIAGNOSENoise, temperature and EM thickness logs where a test fails
  3. REPAIRA patch, a bismuth-alloy barrier or a workover, as the evidence decides
  4. RECORDResults in WelliRS, linked to your SAP work orders

WHY IT PAYS · PUBLISHED SOURCES

Integrity problems are common, and costly when found late

~US$150 million

Of assets protected by restoring two high-risk wells, with 95 MMscf/d of injection gas supporting ~32,000 bopd for six years.

ADMA-OPCO · SPE-138238-MS

30–45%

Of active wells worldwide carry some integrity issue; sustained annulus pressure alone affects 10–30% of mature stocks.

Yakoot et al., 2021; Schulz et al., 2025

Gas-lift wells

In Egyptian data, gas-lift wells show the most severe integrity failures: 9,000 records, 23 features.

GUPCO and FUE, 2022

> 600 wells

One system turns tests into decisions: MAASP, barrier register, anomaly tracking and KPI dashboards.

BAPETCO, 2023

RIGLESS BY DESIGN

Through-tubing logs, EM thickness surveys, casing patches and micro-fine cement diagnose and repair without the rig workover that an integrity anomaly otherwise triggers (SPE-161983-MS; SPE-190888-MS; SPE-138238-MS).

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Gulf of Suez, GUPCO · 2005–07Gap study and risk-ranked well integrity management system for ~600 wells on 90 platforms; high-risk register and a dedicated well-services teamSystem embedded across 315 MBLPD at 75% water cut; barrier-failed wells shut in and repaired on a risk basisIPTC-11678-MS
Egypt · Western Desert, BAPETCO · 2023Well-integrity management software: MAASP, well failure model, barrier management, 16 ISO-standard reportsMore than 600 production and injection wells across six concessions on one integrity recordHalliburton / Landmark
UAE · Umm Shaif, ADMA-OPCO · 2010Root-cause analysis and micro-fine cement remediation of the two highest-risk gas wellsSurface gas bubbling eliminated; ~US$150M of assets restored; 32,000 bopd supported for six yearsSPE-138238-MS
Undisclosed NOC · Wellbore Technology · currentAI annulus-pressure analysis across the well portfolio (vendor testimonial)Three wells with developing sustained annulus pressure flagged that manual review had missedWellbore Technology

Name one platform or one well stock.

We write the test programme for your approval and mobilise one crew against it.