WIT
Wellhead integrity test
Tree valves, hanger and spool seals, annulus outlets, connections, lockdown screws.
Every barrier on the wellhead and in the string pressure- or function-tested and recorded against its limit, with MAASP management.
APPLICATIONS
THE QUESTION IT ANSWERS
One crew, one programme: every barrier element on the wellhead and in the string is pressure-tested or function-tested, and each result is recorded against its limit.
The aim is wells operated inside proven limits, with planned and unplanned deferral reduced.
What each result records
WHAT IT TESTS
FIVE ELEMENTS, ONE SERVICE
WIT
Tree valves, hanger and spool seals, annulus outlets, connections, lockdown screws.
SIT
Tubing, packer, SCSSV and control line, tubing-to-annulus communication.
MAASP
Annulus pressure surveys, bleed-down and build-up, MAASP derivation and limits.
LEAK
Noise and temperature logs, EM corrosion surveys: diagnosis as a core step.
DATA
WelliRS barrier register, test programmes and a resident wellhead specialist.
HOW THE SERVICE RUNS
THE WELL LIFE CYCLE
| Drilling and completion | Production and workovers | Suspension and abandonment | |
|---|---|---|---|
| Controls | Barrier design, completion and tree acceptance tests | WIT and SIT schedules, MAASP limits, SSSV tests, greasing | Permanent barriers: bridge plugs, cement, bismuth-alloy seals |
| Monitoring | Installation pressure tests, baseline annulus readings | Annulus pressure trends, noise, temperature and EM surveys | Barrier verification and pressure tests |
| Decision | Hand-over to production with a verified barrier register | Continue, repair by patch or alloy seal, workover, or shut in | Barrier acceptance and regulatory close-out |
Every decision point is recorded in the barrier register, so the next crew inherits evidence, not assumptions.
WHERE IT FITS
WHY IT PAYS · PUBLISHED SOURCES
~US$150 million
Of assets protected by restoring two high-risk wells, with 95 MMscf/d of injection gas supporting ~32,000 bopd for six years.
30–45%
Of active wells worldwide carry some integrity issue; sustained annulus pressure alone affects 10–30% of mature stocks.
Gas-lift wells
In Egyptian data, gas-lift wells show the most severe integrity failures: 9,000 records, 23 features.
> 600 wells
One system turns tests into decisions: MAASP, barrier register, anomaly tracking and KPI dashboards.
RIGLESS BY DESIGN
Through-tubing logs, EM thickness surveys, casing patches and micro-fine cement diagnose and repair without the rig workover that an integrity anomaly otherwise triggers (SPE-161983-MS; SPE-190888-MS; SPE-138238-MS).
Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.
| Where · when | What was done | Published result | Source |
|---|---|---|---|
| Egypt · Gulf of Suez, GUPCO · 2005–07 | Gap study and risk-ranked well integrity management system for ~600 wells on 90 platforms; high-risk register and a dedicated well-services team | System embedded across 315 MBLPD at 75% water cut; barrier-failed wells shut in and repaired on a risk basis | IPTC-11678-MS |
| Egypt · Western Desert, BAPETCO · 2023 | Well-integrity management software: MAASP, well failure model, barrier management, 16 ISO-standard reports | More than 600 production and injection wells across six concessions on one integrity record | Halliburton / Landmark |
| UAE · Umm Shaif, ADMA-OPCO · 2010 | Root-cause analysis and micro-fine cement remediation of the two highest-risk gas wells | Surface gas bubbling eliminated; ~US$150M of assets restored; 32,000 bopd supported for six years | SPE-138238-MS |
| Undisclosed NOC · Wellbore Technology · current | AI annulus-pressure analysis across the well portfolio (vendor testimonial) | Three wells with developing sustained annulus pressure flagged that manual review had missed | Wellbore Technology |
We write the test programme for your approval and mobilise one crew against it.