BARRIER VERIFICATION
A verified status per well
Well barrier schematics and verification status per well; safety-critical valves and SCSSV testing regimes reviewed for coverage and closure.
Every well a verified barrier system: statuses known, annulus pressures managed, and ageing wells kept honest between workovers.
APPLICATIONS
WHAT THE STUDY COVERS
BARRIER VERIFICATION
Well barrier schematics and verification status per well; safety-critical valves and SCSSV testing regimes reviewed for coverage and closure.
ANNULUS PRESSURE
Sustained casing pressure diagnosed, thresholds set, and monitoring and bleed-down practices formalized.
AGEING AND CHANGE OF SERVICE
Integrity reassessment for late-life wells, producer-to-injector conversions and suspended stock.
INTEGRITY STATEMENTS
Well integrity statements and risk-ranked anomaly registers feeding the maintenance and workover plan.
CASE STUDY · ANONYMIZED
Mature-asset operator
SCOPE
Establish the true integrity status of a mixed-age well stock and rank what to fix first.
DELIVERED
Barrier schematics and verification status for the stock; sustained-casing-pressure diagnosis and thresholds; a risk-ranked anomaly register with workover priorities; integrity statements aligned to the operator's assurance framework.
Related Production & Technology services: WIT and SIT testing, EPDT multi-pipe inspection, noise and temperature logging, and bismuth-alloy barriers.
ALSO IN THIS PRACTICE
POLICY
Well integrity programme and policy design.
MAASP
MAASP, barrier and annulus assessments.
PROCESS SAFETY
Process safety gap assessments, and barrier and safety-critical element management.
FACILITATION
HAZOP and HAZID facilitation, with environmental compliance and produced water.
Each review ends with a ranked list of actions, their value and who owns them.
WHERE IT FITS
WHY IT PAYS · PUBLISHED SOURCES
30–45%
Of active wells worldwide carry some integrity issue; sustained annulus pressure alone affects 10–30% of mature stocks.
> 600 wells
One system turns tests into decisions: MAASP, barrier register, anomaly tracking and KPI dashboards.
~600 wells
On 90 platforms under a risk-ranked well integrity management system, embedded across 315 MBLPD at 75% water cut.
Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.
| Where · when | What was done | Published result | Source |
|---|---|---|---|
| Egypt · Gulf of Suez, GUPCO · 2005–07 | Gap study and risk-ranked well integrity management system for ~600 wells on 90 platforms; high-risk register and a dedicated well-services team | System embedded across 315 MBLPD at 75% water cut; barrier-failed wells shut in and repaired on a risk basis | IPTC-11678-MS |
| Egypt · Western Desert, BAPETCO · 2023 | Well-integrity management software: MAASP, well failure model, barrier management, 16 ISO-standard reports | More than 600 production and injection wells across six concessions on one integrity record | Halliburton / Landmark |
The CISS team replies with a scope, the data we would need and the acceptance criteria.