ENGINEERINGWELL INTEGRITY

Well integrity management

Every well a verified barrier system: statuses known, annulus pressures managed, and ageing wells kept honest between workovers.

Barriers
Schematics and verification status
Annuli
Pressure thresholds and bleed-down
Register
Risk-ranked anomaly register
Framed to
ISO 16530 and API RP 90

APPLICATIONS

Where it is applied

  • Barrier baselineThe full well stock assessed
  • Operating limitsMAASP for each annulus
  • Risk rankingAn anomaly register with actions and owners
  • System health checkYour integrity system assessed against the standards
  • RecordsEvery result held in WelliRS
  • Later lifeExtension, suspension and abandonment decisions

WHAT THE STUDY COVERS

From barrier schematics to a ranked workover plan

BARRIER VERIFICATION

A verified status per well

Well barrier schematics and verification status per well; safety-critical valves and SCSSV testing regimes reviewed for coverage and closure.

ANNULUS PRESSURE

Managed, not tolerated

Sustained casing pressure diagnosed, thresholds set, and monitoring and bleed-down practices formalized.

AGEING AND CHANGE OF SERVICE

Late-life wells reassessed

Integrity reassessment for late-life wells, producer-to-injector conversions and suspended stock.

INTEGRITY STATEMENTS

Evidence for the workover plan

Well integrity statements and risk-ranked anomaly registers feeding the maintenance and workover plan.

CASE STUDY · ANONYMIZED

Well integrity baseline across a mature stock

Mature-asset operator

SCOPE

Establish the true integrity status of a mixed-age well stock and rank what to fix first.

DELIVERED

Barrier schematics and verification status for the stock; sustained-casing-pressure diagnosis and thresholds; a risk-ranked anomaly register with workover priorities; integrity statements aligned to the operator's assurance framework.

  • Full-stock barrier baseline
  • Risk-ranked anomaly register
  • Workover plan prioritized

Related Production & Technology services: WIT and SIT testing, EPDT multi-pipe inspection, noise and temperature logging, and bismuth-alloy barriers.

ALSO IN THIS PRACTICE

HSSE and integrity studies

POLICY

Programme and policy design

Well integrity programme and policy design.

MAASP

Barrier and annulus assessments

MAASP, barrier and annulus assessments.

PROCESS SAFETY

Gap assessments

Process safety gap assessments, and barrier and safety-critical element management.

FACILITATION

HAZOP and HAZID

HAZOP and HAZID facilitation, with environmental compliance and produced water.

Each review ends with a ranked list of actions, their value and who owns them.

WHERE IT FITS

Verify, manage, rank, record

  1. VERIFYBarrier schematics and WIT and SIT results for every well
  2. MANAGEAnnulus pressures against MAASP limits, with monitoring and bleed-down formalized
  3. RANKA risk-ranked anomaly register with workover priorities
  4. RECORDResults in WelliRS, so the next crew inherits evidence

WHY IT PAYS · PUBLISHED SOURCES

Integrity problems are common, and costly when found late

30–45%

Of active wells worldwide carry some integrity issue; sustained annulus pressure alone affects 10–30% of mature stocks.

Yakoot et al., 2021; Schulz et al., 2025

> 600 wells

One system turns tests into decisions: MAASP, barrier register, anomaly tracking and KPI dashboards.

BAPETCO, 2023

~600 wells

On 90 platforms under a risk-ranked well integrity management system, embedded across 315 MBLPD at 75% water cut.

GUPCO · IPTC-11678-MS

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Gulf of Suez, GUPCO · 2005–07Gap study and risk-ranked well integrity management system for ~600 wells on 90 platforms; high-risk register and a dedicated well-services teamSystem embedded across 315 MBLPD at 75% water cut; barrier-failed wells shut in and repaired on a risk basisIPTC-11678-MS
Egypt · Western Desert, BAPETCO · 2023Well-integrity management software: MAASP, well failure model, barrier management, 16 ISO-standard reportsMore than 600 production and injection wells across six concessions on one integrity recordHalliburton / Landmark

Name one well stock.

The CISS team replies with a scope, the data we would need and the acceptance criteria.