Waterflood health check & EOR screening

Check the waterflood first, then earn the right to EOR: the flood is health-checked, each reservoir is screened against conformance, engineered water, polymer and surfactant options, and the way forward is costed up to the pilot.

Starts with
Field screening and a water-injection health check
Screens for
Conformance, engineered water, polymer, surfactant-polymer
Leads to
Laboratory programme, injectivity test, pilot
Delivered
Ranked opportunities with cost and next steps

APPLICATIONS

Where it is applied

  • Mature waterfloodsRising water cut and oil left between the wells
  • Injectors that take water with no response in the producers
  • Fields considering polymer, surfactant or engineered-water injection
  • Thief zones and channellingConformance before chemistry
  • Heavy and viscous oilMobility-control options
  • Investment decisionsA costed route from screening to pilot

Is the flood working, and what should follow it?

Many mature floods lose oil to poor sweep, falling injectivity and water cycling long before chemistry is the answer. We check the flood first; a field that passes is then screened for the EOR method its rock, oil and water can support.

Four checks before any chemical is ordered

Is the flood near its limit?

Recovery to date against the expected ultimate, and where the remaining oil sits.

Fix the flood first

Rates, voidage replacement, water quality, injectivity and injection profiles.

Match the method to the reservoir

Each reservoir screened for in-depth conformance, engineered water, polymer and surfactant-polymer.

Costed to the pilot

Laboratory programme, single-well injectivity test and pattern pilot, each with a decision gate.

Six steps, each with a gate

  1. 1Field screening. Recovery, remaining oil and flood maturity from the data you already hold.
  2. 2Water-injection health check. Injection and production profiles, Hall plots, water quality and injector-to-producer links.
  3. 3EOR screening. Reservoir by reservoir, against published screening criteria and analogue fields.
  4. 4Laboratory programme. Fluids, rock and chemical screening on your own samples.
  5. 5Single-well injectivity test. Proves the chemical goes in at rate before a pattern is committed.
  6. 6Pattern pilot. Baseline, observation wells and surveillance, with success criteria agreed in advance.

Each field is confirmed with its own data and laboratory tests before any chemical is recommended. Where injectivity has fallen, injectors are cleaned up first with MaxStim Fusion stimulation.