Clamp-on ultrasonic flow surveys

Gas-lift injection, water-injection headers and gas producers measured from outside the pipe: no cutting, no hot work, no shut-in.

Pipe diameter
0.28–63 in
Flow velocity
0.03–115 ft/s
Pipe temperature
40–392 °F
Uncertainty
±1–2% of MV ±0.02 ft/s
Clamp-on ultrasonic flow survey: two transducers strapped on the outside of a pipe, ultrasonic path through the flow and a transmitter logger
Survey set-up: transducers on the pipe, ultrasonic path and transmitter

APPLICATIONS

Where it is applied

  • Gas-lift injectionThe gas rate to each well, measured from outside the pipe
  • Water injectionThe rate to each injector, for flood balance
  • Gas and crude linesFlow checked with no shutdown
  • Meter verificationInstalled meters checked in place
  • Allocation and balanceFuel, flare and sales gas
  • Process plantsUtility and process flows

THE QUESTION IT ANSWERS

How much gas or water is really going down each line?

Transit-time transducers strapped to the outside of the pipe measure single-phase gas or water, so the reading is independent of the permanent meter and the line stays in service.

When to run it

  • Gas-lift injection, line by line
  • Water-injection header distribution
  • Gas producers and well flowlines
  • Validation of suspect permanent meters

HOW IT WORKS

Two pulses, one transit-time difference

  1. 1Strap on. Transducers are strapped on the pipe: no cutting, no hot work, no shut-in.
  2. 2Enter the pipe. Pipe OD, wall thickness and material are entered on site.
  3. 3Pulse. Ultrasonic pulses cross the fluid with and against the flow. Like a swimmer against the current, a pulse moves more slowly against the flow.
  4. 4Measure. The transmitter turns the transit-time difference into velocity and rate, with a profile correction, and logs it.
  5. 5Validate. A validation day and a QA/QC'd report reconciled against design and allocation rates.
  6. Reflection mode doubles the sound path for small pipes or low velocities; diagonal mode suits large pipes and difficult fluids.
Two ultrasonic pulses crossing the pipe, one with the flow and one against it, between two transducers
Sound path between the transducers: with and against the flow
Diagonal and reflection transducer arrangements on a pipe
Diagonal (left) and reflection (right) arrangements

WHAT YOU GET

A validation day and a reconciled report

Two clamp-on transducers mounted on a rail strapped to a pipe
Transducers on the mounting rail

Every survey ends with a measured rate for each line, set against the design and allocation rates the operation already carries.

VALIDATION DAY

Each survey includes a validation day.

REPORT

A QA/QC'd report, reconciled against design and allocation rates.

Why operators run it

  • No cutting or weldingThe transducers mount on the outside of the pipe
  • No interruption to productionNo hot work and no shut-in
  • Extreme conditionsHigh temperatures, varying flow rates and harsh environments
  • Rugged and self-calibratingDurable transducers with auto-calibration
  • Offshore and mobileCompact, long-lasting battery, water-resistant housing
  • Flow changes trackedAny change in flow, upstream and downstream, monitored accurately

Typical specifications

Measurement
MeasurementSingle-phase
Pipe diameter0.28–63 in
Flow velocity0.03–115 ft/s
Pipe temperature40–392 °F
Measurement uncertainty±1–2% of MV ±0.02 ft/s
Repeatability0.15% of MV ±0.02 ft/s
Pressure range15 psi to unlimited

MV: measured value.

Transducer arrangement
ArrangementMounting
DiagonalTransducers on opposite sides of the pipe; suits large pipes and difficult fluids
ReflectionTransducers on the same side of the pipe; doubles the sound path for small pipes or low velocities

REPORTED USE

Where clamp-on meters are already in use

EGYPT AND THE GULF

Dubai Petroleum Company

Used successfully for over five years with high-accuracy measurement.

EGYPT

GUPCO

Implemented for accurate gas-flow measurement; offshore operations use portable ultrasonic meters for gas-lift and water-injection rate monitoring.

EGYPT

Khalda Petroleum Company

Clamp-on ultrasonic meters give rapid, non-intrusive monitoring of water-injection wells at onshore facilities, run by the Khalda operations team.

INTERNATIONAL

Statoil, water-injection monitoring

Injection volumes were gauged with differential-pressure meters prone to abrasion and deposits. Clamp-on meters were installed with no pipe cutting or downtime, improving reliability and cutting maintenance.

INTERNATIONAL

ROC Oil, C9 platform

A portable clamp-on meter verified the turbine meters on the water-injection lines: on DN150 pipes, readings matched within 0.3%.

Reported use as compiled in the Streamlines Technology Library (2026). These are not published case histories.

WHERE IT FITS

Measure, reconcile, optimise, act

  1. MEASUREClamp-on survey of lift-gas, water-injection and gas lines
  2. RECONCILEA QA/QC'd report against design and allocation rates
  3. OPTIMISELift gas reallocated on a calibrated well and network model
  4. ACTReallocate lift gas, and send the saved gas to shut-in wells

WHY IT PAYS · PUBLISHED SOURCES

Lift-gas meters in mature fields read low

75–124%

Under-reading found on field lift-gas meters, in all ten surveyed wells.

ADNOC · SPE-208003-MS

~10% of liquids

What accurate per-well injection data was worth, around US$200,000 per well per year.

Shell, Badan field · SPE-193413-MS

535–556 bbl

Of oil per MMscf of lift gas in the Gulf of Suez, so freed gas revives shut-in wells.

GUPCO · OGJ, 1996

EGYPT, SAME COMPRESSORS

GUPCO Ramadan: +2,024 bopd across 19 wells by reallocating lift gas. GUPCO Field A: +510 bopd and 5.5 MMscfd of HP gas freed at the same compressor capacity.

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Ramadan field, GUPCO · 1996Gas-lift optimisation of 19 wells: per-well performance curves, injection depth and gas reallocation+2,024 bopd achieved (projected +2,115); 535 → 556 bbl per MMscf injectedOGJ, Abdel-Waly et al.
Egypt · offshore Field A, GUPCO · 2014Integrated PROSPER/GAP network model; gas reallocated and saved gas sent to three shut-in wells+510 bopd in total; ~5.5 MMscfd HP gas savedOTC-24703-MS
Nigeria · Badan field, Shell · 2018Portable clamp-on ultrasonic gas meter on lift-gas lines for optimisation and testingAccurate per-well injection data worth about 10% of liquids ≈ US$200k per well per year; lift gas reducedSPE-193413-MS

No published Egyptian clamp-on case: the Egyptian evidence is for gas-lift optimisation, which these surveys feed.

Name one line and one doubt.

We plan the survey with you: which lines, which meters to check, and the report you will receive.