VALIDATION DAY
Each survey includes a validation day.
Gas-lift injection, water-injection headers and gas producers measured from outside the pipe: no cutting, no hot work, no shut-in.
APPLICATIONS
THE QUESTION IT ANSWERS
Transit-time transducers strapped to the outside of the pipe measure single-phase gas or water, so the reading is independent of the permanent meter and the line stays in service.
When to run it
HOW IT WORKS
WHAT YOU GET
Every survey ends with a measured rate for each line, set against the design and allocation rates the operation already carries.
VALIDATION DAY
Each survey includes a validation day.
REPORT
A QA/QC'd report, reconciled against design and allocation rates.
| Measurement | Single-phase |
|---|---|
| Pipe diameter | 0.28–63 in |
| Flow velocity | 0.03–115 ft/s |
| Pipe temperature | 40–392 °F |
| Measurement uncertainty | ±1–2% of MV ±0.02 ft/s |
| Repeatability | 0.15% of MV ±0.02 ft/s |
| Pressure range | 15 psi to unlimited |
MV: measured value.
| Arrangement | Mounting |
|---|---|
| Diagonal | Transducers on opposite sides of the pipe; suits large pipes and difficult fluids |
| Reflection | Transducers on the same side of the pipe; doubles the sound path for small pipes or low velocities |
REPORTED USE
EGYPT AND THE GULF
Used successfully for over five years with high-accuracy measurement.
EGYPT
Implemented for accurate gas-flow measurement; offshore operations use portable ultrasonic meters for gas-lift and water-injection rate monitoring.
EGYPT
Clamp-on ultrasonic meters give rapid, non-intrusive monitoring of water-injection wells at onshore facilities, run by the Khalda operations team.
INTERNATIONAL
Injection volumes were gauged with differential-pressure meters prone to abrasion and deposits. Clamp-on meters were installed with no pipe cutting or downtime, improving reliability and cutting maintenance.
INTERNATIONAL
A portable clamp-on meter verified the turbine meters on the water-injection lines: on DN150 pipes, readings matched within 0.3%.
Reported use as compiled in the Streamlines Technology Library (2026). These are not published case histories.
WHERE IT FITS
WHY IT PAYS · PUBLISHED SOURCES
75–124%
Under-reading found on field lift-gas meters, in all ten surveyed wells.
~10% of liquids
What accurate per-well injection data was worth, around US$200,000 per well per year.
535–556 bbl
Of oil per MMscf of lift gas in the Gulf of Suez, so freed gas revives shut-in wells.
EGYPT, SAME COMPRESSORS
GUPCO Ramadan: +2,024 bopd across 19 wells by reallocating lift gas. GUPCO Field A: +510 bopd and 5.5 MMscfd of HP gas freed at the same compressor capacity.
Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.
| Where · when | What was done | Published result | Source |
|---|---|---|---|
| Egypt · Ramadan field, GUPCO · 1996 | Gas-lift optimisation of 19 wells: per-well performance curves, injection depth and gas reallocation | +2,024 bopd achieved (projected +2,115); 535 → 556 bbl per MMscf injected | OGJ, Abdel-Waly et al. |
| Egypt · offshore Field A, GUPCO · 2014 | Integrated PROSPER/GAP network model; gas reallocated and saved gas sent to three shut-in wells | +510 bopd in total; ~5.5 MMscfd HP gas saved | OTC-24703-MS |
| Nigeria · Badan field, Shell · 2018 | Portable clamp-on ultrasonic gas meter on lift-gas lines for optimisation and testing | Accurate per-well injection data worth about 10% of liquids ≈ US$200k per well per year; lift gas reduced | SPE-193413-MS |
No published Egyptian clamp-on case: the Egyptian evidence is for gas-lift optimisation, which these surveys feed.
We plan the survey with you: which lines, which meters to check, and the report you will receive.