ISO 9001 · 14001 · 45001 certified · EGPC-registered
ENGINEERINGPRODUCTION ENGINEERING

Lift and gas-lift engineering

From data QC to an economically ranked lift programme: an integrated workflow in which no design decision is taken on a stand-alone well model.

Screening
Gas lift, rod, jet, PCP, plunger
Gas lift
Valve depths, sizes and types
Health checks
To root cause, ranked by NPV
Models
Coupled to the surface network

APPLICATIONS

Where it is applied

  • Gas-lift designMandrel spacing, valves and injection rates
  • RedesignAs water cut and reservoir pressure change
  • TroubleshootingMultipointing, heading and unloading problems
  • Field-wide allocationLift gas shared across the wells
  • Lift-method screeningNew wells and wells due for conversion
  • Hand-overModels and training for your engineers

THE WORKFLOW

Six steps from data to a ranked programme

  1. 1Data gathering and QC. Client data assembled digitally; every gap logged and closed with agreed assumptions before modelling.
  2. 2P&ID validation. Diagrams checked against the real network to capture unrecorded changes; measurement and allocation methods documented.
  3. 3Wellbore modelling. Well models, including gas-lifted wells, built and coupled to reservoir and surface facility models.
  4. 4Lift screening. Gas lift, rod, jet, PCP and plunger evaluated on physics and economics, not habit or vendor preference.
  5. 5Gas-lift design. Valve depths, sizes and types; optimum injection rate by sensitivity; unloading simulated, stability assessed.
  6. 6Forecast and economics. Production predicted per lift mode over time; NPV-based analysis ranks the options.

EVERY MAJOR LIFT SYSTEM

Designed for the well, checked against its design, troubleshot to root cause

GAS LIFT

Valves and injection

Valve spacing, sizing and type; optimum injection rate by sensitivity; unloading simulated and stability verified; lift-gas allocation across the network.

SUCKER ROD / BEAM

Rod lift

Rod-string and pump sizing; dynamometer-card diagnostics; counterbalance and gearbox loading; pump-off control tuned for gassy and deviated wells.

JET PUMP

Jet pumps

Nozzle–throat sizing and power-fluid design; cavitation screening; a strong fit for sandy, deviated or remote wells needing rigless retrieval.

PLUNGER LIFT

Plunger lift

Liquid-loading screening for gas and high-GLR wells; plunger type and cycle design; controller tuning; intermittent gas lift where pressure fades.

UNCONVENTIONAL AND HYBRID

A strategy staged across the well's life

High-pressure gas lift, gas-assisted plunger, rod-lift conversions.

Health check and troubleshooting: baseline versus design, surveillance trending, diagnostics (sensor data, dyno cards, valve surveys, well tests), root cause, then corrective actions ranked by NPV.

EXAMPLE STUDY

Gas-well deliquification and revival

  1. 1Inventory. Well inventory, data QC and loading symptoms.
  2. 2Critical rate. Critical-rate screening: Turner and Coleman.
  3. 3Nodal analysis. Inflow and outflow per well.
  4. 4Solution design. Velocity-string sizing, plunger lift cycles (Foss and Gaul).
  5. 5Economics and pilot. Ranking, then a pilot with surveillance.

ENGAGEMENT SPOTLIGHT · ANONYMIZED

Fifteen wells, one system, every barrel priced

Offshore Gulf of Suez producer

SCOPE

Lift decisions were being made well by well while the surface network quietly took back what the designs promised.

DELIVERED

Every existing and planned well modelled and coupled to the network; lift options screened on physics and economics; gas-lift designs simulated through unloading; do-nothing and optimized forecasts.

  • Gas lift selected on evidence
  • Valve designs issued
  • A debottlenecking sequence ranked by NPV: deferred production made visible and recoverable

15

Wells, existing and planned

±15%

Match criteria met

GL

Selected on economics

NPV

Ranked action list

WHERE IT FITS

Screen, design, check, rank

  1. SCREENGas lift, rod, jet, PCP and plunger on physics and economics
  2. DESIGNGas lift through unloading, with valve depths, sizes and types
  3. CHECKEach system against its own design, to root cause
  4. RANKCorrective actions by NPV, with the network's response deciding the order

WHY IT PAYS · PUBLISHED SOURCES

Gas-lift studies in the Gulf of Suez

5.5–19 MMscfd

Of lift gas freed by allocation studies on GUPCO platforms, adding 330–510 bopd with no new compression.

OTC-24703-MS; Mansour, Cairo University, 2018

+1,700 bopd

A further gain in the model from deeper injection on selected wells.

OTC-24703-MS; Mansour, Cairo University, 2018

+19.4%

Oil from single-well lift optimisation on an offshore jet-pump well.

PetroGulf Misr · Petroleum Research, 2023

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Ramadan field, GUPCO · 1996Gas-lift optimisation of 19 wells: per-well performance curves, injection depth and gas reallocation+2,024 bopd achieved (projected +2,115); 535 → 556 bbl per MMscf injectedOGJ, Abdel-Waly et al.
Egypt · offshore Field A, GUPCO · 2014Integrated PROSPER/GAP network model; gas reallocated and saved gas sent to three shut-in wells+510 bopd in total; ~5.5 MMscfd HP gas savedOTC-24703-MS
Egypt · offshore well GA-1A, PetroGulf Misr · 2023PROSPER model of a water-oil jet pump; motive rate and pressure optimisedOil +19.43%; tubing roughness shown to cost 20–25% of liquidsPetroleum Research 8(4)

Name one lift decision.

The CISS team replies with a scope, the data we would need and the acceptance criteria.

Discuss a lift study