Artificial lift systems
Beam and long-stroke units, plunger lift, jet pumps and PCP drive heads, selected on the well's own data.
- Systems
- Beam, long-stroke, plunger, jet, PCP
- Selected on
- The well's own data
- Automation
- Wireless load cells
- Surveys
- Echometer, from surface
APPLICATIONS
Where it is applied
- Lift selectionThe method matched to rate, depth, gas and sand
- Gas wellsPlunger lift and velocity strings for liquid loading
- Low-rate oil wellsRod pumping and long-stroke units
- Heavy and sandy oilPCP and jet pumps
- Deviated and remote wellsJet pumps with no moving parts downhole
- ConversionsA well moved from one lift method to another
THE QUESTION IT ANSWERS
Which lift system suits this well, and is it doing its job?
Every programme starts from measurement: well tests, logs and fluid samples define the candidate before anything is pumped or installed. Lift options are evaluated on physics and economics, not habit or vendor preference.
What the choice rests on
- The well's own data
- Physics and economics, not habit
- Wireless load-cell automation and Echometer surveys on rod-lift wells
- A health check against the design once running
SYSTEMS
Where each system fits
| System | Where it fits |
|---|---|
| Beam and long-stroke units | Rod-lift wells; long stroke for deeper, higher-rate duty |
| Plunger lift | Liquid-loaded and intermittent gas wells |
| Jet pumps | Deviated, sandy or gassy wells; no moving parts downhole |
| PCP drive heads | Viscous and sandy crude |
| Gas-lift valves | Gas-lift design and valve change-outs |
| Supersonic suction tool | Extra drawdown on gas-lift wells, set by slickline |
Plus wireless load-cell automation and Echometer surveys to keep rod-lift wells pumped down, not pumped off.
PLUNGER LIFT
Casing gas is the stored energy
- 1Shut-in. The valve is closed and pressure builds in the casing.
- 2Lift. The plunger lifts the liquid slug to the lubricator and catcher.
- 3Afterflow. Gas flows, and the plunger falls to the bumper spring.
- The parts: lubricator and catcher, motor valve and controller, plunger, liquid slug, bumper spring, and casing gas as the stored energy.
WHERE IT FITS
Select, install, survey, review
- SELECTOn the well's own data, on physics and economics
- INSTALLPlunger and rod lift with United Lift Technologies, supported in Cairo
- SURVEYEchometer surveys and load-cell automation keep rod-lift wells pumped down
- REVIEWA health check of each system against its own design
WHY IT PAYS · PUBLISHED SOURCES
Plunger lift is the lowest-capex lift
US$1,500–6,000
Installed cost of plunger lift, against US$20,000–40,000 for beam lift; payback about one month against 14.
10–20%
Production added by automated cycles, which also cut venting; BP automated more than 2,150 San Juan wells.
NPV ≈ US$9.7 M
From a 17-well plunger programme on ≈ US$1.5 million capex, with +5–6 MMcfd and +6.5 Bcf reserves.
US$52,300 a year
Emulsifier saved on one Mexican well with a 30-day payback: chemical and swabbing costs fall away.
LIFT ON THE WELL'S OWN DATA
Fluid-level and dynamometer surveillance keeps rod-lift wells pumped down, not pumped off; on Egyptian field data, fluid-level-derived pump-intake pressure sits within 12–33% of measured values (JPEPT 2020).
Published case histories
Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.
| Where · when | What was done | Published result | Source |
|---|---|---|---|
| Pakistan · United Energy Pakistan · 2021–23 | 17 plunger-lift systems in packer-completed loaded gas wells after 2021–22 trials | +5–6 MMcfd; +6.5 Bcf and 50 MBC reserves; NPV ~US$9.7M against capex ~US$1.5M | SPE-216748-MS |
| Mexico · Eagle Ford horizontal · c. 2015 | Plunger lift with controller replacing nine manual chemical sticks a day | Gas 0.35 → 0.50 MMscfd; condensate 10 → 15 BPD; US$52,300/yr chemicals saved; ~30-day payback | Weatherford |
| Saudi Arabia · Saudi Aramco · 2021 | NACE-compliant plunger lift with automated reporting in a sour, liquids-rich gas well | Installed in a day; gas and liquids increased; more than 10,000 plunger miles in two months | ChampionX / PCS |
| USA · BP Midland Farm; ExxonMobil Big Piney · 1995–2010 | 190 plunger units rolled out; 23 units installed | Install US$10k/well; avoided cost US$20k/well/yr; added production US$22.5k/well/yr; 14,720 Mcf/yr venting cut | EPA Gas STAR |
No published Egyptian plunger-lift field case; vendor papers were presented at SPE NATC Cairo (2012, 2013).
Name one well and its lift.
We review the data and reply with the system that fits, and what to measure first.
