ISO 9001 · 14001 · 45001 certified · EGPC-registered
ARTIFICIAL LIFTARTIFICIAL LIFT

Artificial lift systems

Beam and long-stroke units, plunger lift, jet pumps and PCP drive heads, selected on the well's own data.

Systems
Beam, long-stroke, plunger, jet, PCP
Selected on
The well's own data
Automation
Wireless load cells
Surveys
Echometer, from surface
Plunger lift installation: lubricator, catcher, controller and motor valve at the wellhead, plunger and bottom-hole bumper spring in the tubing
Plunger lift on a gas well

APPLICATIONS

Where it is applied

  • Lift selectionThe method matched to rate, depth, gas and sand
  • Gas wellsPlunger lift and velocity strings for liquid loading
  • Low-rate oil wellsRod pumping and long-stroke units
  • Heavy and sandy oilPCP and jet pumps
  • Deviated and remote wellsJet pumps with no moving parts downhole
  • ConversionsA well moved from one lift method to another

THE QUESTION IT ANSWERS

Which lift system suits this well, and is it doing its job?

Every programme starts from measurement: well tests, logs and fluid samples define the candidate before anything is pumped or installed. Lift options are evaluated on physics and economics, not habit or vendor preference.

What the choice rests on

  • The well's own data
  • Physics and economics, not habit
  • Wireless load-cell automation and Echometer surveys on rod-lift wells
  • A health check against the design once running

SYSTEMS

Where each system fits

Lift systems and where each fits
SystemWhere it fits
Beam and long-stroke unitsRod-lift wells; long stroke for deeper, higher-rate duty
Plunger liftLiquid-loaded and intermittent gas wells
Jet pumpsDeviated, sandy or gassy wells; no moving parts downhole
PCP drive headsViscous and sandy crude
Gas-lift valvesGas-lift design and valve change-outs
Supersonic suction toolExtra drawdown on gas-lift wells, set by slickline

Plus wireless load-cell automation and Echometer surveys to keep rod-lift wells pumped down, not pumped off.

PLUNGER LIFT

Casing gas is the stored energy

  1. 1Shut-in. The valve is closed and pressure builds in the casing.
  2. 2Lift. The plunger lifts the liquid slug to the lubricator and catcher.
  3. 3Afterflow. Gas flows, and the plunger falls to the bumper spring.
  4. The parts: lubricator and catcher, motor valve and controller, plunger, liquid slug, bumper spring, and casing gas as the stored energy.
Plunger lift in three stages: shut-in with pressure building, lift of the liquid slug by the plunger, and afterflow as the plunger falls
Shut-in, lift and afterflow
A long-stroke pumping unit standing on a snow-covered site
Long-stroke unit

WHERE IT FITS

Select, install, survey, review

  1. SELECTOn the well's own data, on physics and economics
  2. INSTALLPlunger and rod lift with United Lift Technologies, supported in Cairo
  3. SURVEYEchometer surveys and load-cell automation keep rod-lift wells pumped down
  4. REVIEWA health check of each system against its own design

WHY IT PAYS · PUBLISHED SOURCES

Plunger lift is the lowest-capex lift

US$1,500–6,000

Installed cost of plunger lift, against US$20,000–40,000 for beam lift; payback about one month against 14.

EPA Natural Gas STAR, 2003

10–20%

Production added by automated cycles, which also cut venting; BP automated more than 2,150 San Juan wells.

EPA, 2010

NPV ≈ US$9.7 M

From a 17-well plunger programme on ≈ US$1.5 million capex, with +5–6 MMcfd and +6.5 Bcf reserves.

United Energy Pakistan · SPE-216748-MS

US$52,300 a year

Emulsifier saved on one Mexican well with a 30-day payback: chemical and swabbing costs fall away.

Weatherford

LIFT ON THE WELL'S OWN DATA

Fluid-level and dynamometer surveillance keeps rod-lift wells pumped down, not pumped off; on Egyptian field data, fluid-level-derived pump-intake pressure sits within 12–33% of measured values (JPEPT 2020).

Published case histories

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Pakistan · United Energy Pakistan · 2021–2317 plunger-lift systems in packer-completed loaded gas wells after 2021–22 trials+5–6 MMcfd; +6.5 Bcf and 50 MBC reserves; NPV ~US$9.7M against capex ~US$1.5MSPE-216748-MS
Mexico · Eagle Ford horizontal · c. 2015Plunger lift with controller replacing nine manual chemical sticks a dayGas 0.35 → 0.50 MMscfd; condensate 10 → 15 BPD; US$52,300/yr chemicals saved; ~30-day paybackWeatherford
Saudi Arabia · Saudi Aramco · 2021NACE-compliant plunger lift with automated reporting in a sour, liquids-rich gas wellInstalled in a day; gas and liquids increased; more than 10,000 plunger miles in two monthsChampionX / PCS
USA · BP Midland Farm; ExxonMobil Big Piney · 1995–2010190 plunger units rolled out; 23 units installedInstall US$10k/well; avoided cost US$20k/well/yr; added production US$22.5k/well/yr; 14,720 Mcf/yr venting cutEPA Gas STAR

No published Egyptian plunger-lift field case; vendor papers were presented at SPE NATC Cairo (2012, 2013).

Name one well and its lift.

We review the data and reply with the system that fits, and what to measure first.

Review a lift choice