ISO 9001 · 14001 · 45001 certified · EGPC-registered
INTERVENTIONGAS WELLS

Velocity strings

Coiled-tubing strings run in live wells to restore gas velocity and unload liquids, with no rig on location.

Run
Live, under pressure
Rig
None on location
Hang-off
Surface spool or sub-surface
Engineering first
Critical-velocity analysis
Velocity string installation: coiled tubing hanger spool, coiled tubing string and deployment valve
Coiled tubing hanger spool, coiled tubing string and deployment valve

APPLICATIONS

Where it is applied

  • Liquid-loaded gas wellsWells that still hold reserves
  • Low-rate wellsFlowing below the critical rate
  • Gas-condensate wellsDeclining rate and rising liquid
  • Live wellsRigless installation
  • Instead of compressionOr of frequent unloading
  • Later lifeStaged with plunger lift as the well declines

THE QUESTION IT ANSWERS

Is liquid loading holding back a gas well that still has reserves?

As reservoir pressure falls, gas velocity drops below the critical rate and liquids load up. A smaller-bore coiled-tubing string restores velocity, run and retrieved under pressure with no rig on location.

Candidate engineering comes first

  • Critical-velocity analysis on measured rates
  • String sizing against the loading model
  • Post-installation surveillance

HOW IT WORKS

A smaller bore restores the velocity

  1. 1Loaded. A loaded liquid column sits in the tubing.
  2. 2Hang-off. A hanger spool at the tree carries the string.
  3. 3String. A coiled-tubing string runs inside the tubing.
  4. 4Valve. A deployment valve at the bottom of the string.
  5. 5Flow. Gas moves above the critical velocity and carries the liquids out.
Left: a liquid-loaded well. Right: the same well with a velocity string, gas above the critical velocity carrying liquids out
A liquid-loaded well, and the same well with a velocity string

TWO WAYS TO HANG THE STRING

Surface spool or sub-surface hang-off

SURFACE-SPOOL HANG-OFF

Hanger spool below the tree

No load on the old tubing; nipple profiles kept for future isolation.

SUB-SURFACE HANG-OFF

Landed on a high-load packer

Landed downhole on a high-load packer; the tree unmodified; a simpler operation where restrictions allow.

WHERE IT FITS

Screen, size, run, watch

  1. SCREENCritical-velocity analysis on measured rates
  2. SIZEThe string sized against the loading model
  3. RUNCoiled tubing run and retrieved under pressure, with no rig on location
  4. WATCHPost-installation surveillance to confirm the gain

WHY IT PAYS · PUBLISHED SOURCES

A rigless route to revive loaded gas wells

US$7,000–64,000

Installed cost per well for +9,125–18,250 Mcf/well/yr; payback 0–3 years at US$3/Mcf, under a year at US$7.

EPA Natural Gas STAR

12 days, 8 people

Rigless and live: 12 days with 8 people against at least 20 days and more than 50 people for a workover; no kill fluid.

Weatherford, Middle East

> 5 MMscf/d

A well dead for two years came back at more than 5 MMscf/d and about 1,000 B/D condensate.

Saudi Aramco · SPE-172527-MS

> 110 strings

In one Omani concession, and 39 in one field in four years, with a standard screening workflow.

PDO · SPE-200241-MS

PUBLISHED PAYBACK

EPA field case: two Gulf Coast wells at US$25,000 each, +25–50 Mcfd per well, 8-month payback, IRR 155%.

Published case histories

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Saudi Arabia · Saudi Aramco · 201510,000 ft 2⅜ in coiled-tubing string inside 4½ in tubing on a standing high-CGR gas well; rates from the test separatorDead for 2 years → more than 5 MMscf/d at 1,900 psig FWHP with ~1,000 B/D condensateSPE-172527-MS
Oman · PDO deep gas · 2023Velocity strings on liquid-loading wells suffering halite deposition after depletion compressionField had lost ~40% of gas to halite; VS wells showed no further deposition, and bullheading and CT clean-outs were eliminatedSPE-213501-MS
Middle East · gas well, 9,160 ft · c. 2015–202⅜ in CT velocity string hung off below the SSSV on a live well; gauges later run inside it0–9 MMscf/d with more than 10 loading shutdowns in 9 months → ~6 MMscf/d without shutdownWeatherford
USA · Gulf Coast · 2008Velocity tubing installed in two wells at US$25,000 each+25–50 Mcfd per well; 8-month payback; IRR 155%EPA Gas STAR

No published Egyptian velocity-string case; SLB presented velocity-string deliquification at EGYPES 2025 and Streamlines has proposed it to Western Desert and Delta operators.

Name one loaded gas well.

We run the critical-velocity screening on your measured rates and reply with whether a string pays.

Screen a gas well