ISO 9001 · 14001 · 45001 certified · EGPC-registered
INTERVENTIONSLICKLINE

Torque Action Debris Breaker

Slickline rotary broaching of scale and debris from tubing walls and nipple profiles.

Body sizes
1½, 1⅞ and 2½ in
Cutting face
360°
Shoes
Changed at surface
Deployed on
Slickline
Torque Action Debris Breaker: a slender body with a spiral cutting shoe
Torque Action Debris Breaker

APPLICATIONS

Where it is applied

  • Hard scaleRemoved from tubing and nipples
  • Debris and fillAbove plugs, valves and fish
  • Stuck componentsValves, sleeves and plugs freed
  • FishingDebris cleared from the top of the fish
  • Wax and asphalteneRestrictions opened
  • Slickline jobsWhere coiled tubing is not available or not justified

THE QUESTION IT ANSWERS

Is scale or debris restricting the tubing, and can access come back without a rig?

The tool removes tubing restrictions caused by scale or debris build-up on the tubing wall or nipple profile. Access is restored at slickline cost, ahead of gauge, plug, logging and velocity-string runs.

When to run it

  • Scale restricting the bore
  • A fouled nipple profile
  • Before gauge, plug and logging runs
  • Before a velocity-string run

HOW IT WORKS

Downward jarring becomes rotary cutting

  1. 1Restriction. Scale restricting the bore.
  2. 2Profile. A fouled nipple profile.
  3. 3Jar. A slickline jar blow, downward.
  4. 4Rotation. Impact becomes rotation: the torque-action mechanism engages.
  5. 5Cut. A 360° cutting shoe breaks up scale and debris along the tubing walls.
  6. 6Clear. Debris falls to the rathole.
Restricted tubing with scale and a fouled nipple profile, and the tool on slickline turning a jar blow into rotation with a cutting shoe
Restricted tubing, and the tool on slickline

Why operators run it

  • Slickline deployedA broach that turns downward jarring into rotary cutting
  • 360° cutting faceFull coverage during broaching
  • Interchangeable shoesSeveral shoe sizes, changed at surface
  • Safe make-upHexagonal flats for safe make-up and break-out
  • Connections to suitOptions to the client's toolstring standard
  • Sour serviceNACE-compliant material option available

Typical specifications

Tool
FeatureDetail
Body sizes1½, 1⅞ and 2½ in
ShoesInterchangeable, changed at surface
Make-upHexagonal flats for safe make-up and break-out
ConnectionsTo the client's toolstring standard
Sour serviceNACE-compliant material option available

WHERE IT FITS

Clear, then survey, isolate, unload

  1. CLEARScale and debris broached from the tubing at slickline cost
  2. SURVEYGauge and logging runs go through the restored bore
  3. ISOLATEPlugs can be set where the well needs them
  4. UNLOADA velocity string can be run in a loaded gas well

WHY IT PAYS · PUBLISHED SOURCES

Slickline clears what acid cannot

230–1,600 ft/h

Slickline descaling clears what acid cannot: iron sulphide, ZnS/PbS and CaSO₄. A 4½ in string was cleared in 12 hours.

Saudi Aramco · SPE-188468-MS

US$250,000

Saved against coiled tubing on one well, followed by a campaign of more than 20 wells.

Al-Khafji Joint Operations · SLB

Drift restored

Restored drift re-opens the well for gauges, plugs, logging and velocity strings; a slickline footprint suits unmanned platforms.

SPE-203113-MS

GULF OF SUEZ

A two-month coiled-tubing attempt on hard sulphide scale gave partial results; the torque-action breaker on slickline restored drift from 2.25 in to 2.7 in and then cleaned three more wells better than CT had (SPE-207684-MS).

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Gulf of Suez, Dragon Oil & GUPCO · 2021Torque Action Debris Breaker on slickline against ZnS/PbS scale after a two-month CT campaign and a workoverDrift 2.25 → 2.7 in; three further wells cleaned better than other slickline tools or CT, at far lower costSPE-207684-MS
Saudi–Kuwait DZ · Al-Khafji JO · 2020–2130 slickline runs cleared calcite bridging in 3½ in tubing on a well shut in for five yearsScale cleared to 3,652 ft; US$250,000 intervention cost saved; a campaign of more than 20 wells followedSLB; MEOS 2021
Saudi Arabia · Saudi Aramco · 2017First wireline torque-action descaling: 95% iron-compound scale in 4½ in tubing after chemical failureTubing cleared in 12 hours at 230–1,600 ft/h, with a fraction of the CT footprintSPE-188468-MS

Name one well and one restriction.

We reply with the body size, the shoes and the run plan.

Discuss a descaling run