Gel conformance and water shut-off

Unwanted water has a source, a path and a chemistry that can close it: conformance control on injectors and shut-off on producers, designed from diagnosis first.

Injectors
Conformance control: fix where water goes in
Producers
Water shut-off: limit where it comes out
Chemistry
Bulk gels, microgels, delayed systems, RPMs
Gate
Diagnosis before any treatment
Two panels: a waterflood in which injection water channels through a thief zone, and the same pattern after conformance treatment and polymer
Waterflood today; then conformance, then polymer

APPLICATIONS

Where it is applied

  • High water cut from channelling or high-permeability streaks
  • Injectors losing water to thief zones
  • Fracture communication between injector and producer
  • Coning near the wellbore
  • Floods to be de-risked before polymer injection

Where is the water coming from, and how is it getting there?

Coning, channelling, fractures and casing leaks each need a different answer, and gel pumped at the wrong one is chemistry wasted with confidence. Diagnosis comes first: production and injection history, PLT and noise logs, and pattern analysis.

Match the product to the feature

Near-wellbore shut-off

Polymer crosslinked in place, where the feature is at the completion: strong, fast and placed shallow by design.

Deep placement

Kinetically or thermally triggered systems that travel with water-like viscosity before they set, for thief paths away from the wellbore.

In-depth conformance

Nanogels, microgels and expandable microgels that penetrate matrix and fine features, swelling or aggregating in place.

Where zones cannot be isolated

Relative permeability modifiers reduce water mobility while leaving oil paths open.

Diagnose, dimension, pump, measure

  1. 1Diagnose. Water source and path from production and injection history, logs and pattern analysis.
  2. 2Choose. The chemistry family from the physics of the feature, inside its temperature, salinity and lithology envelope.
  3. 3Dimension. Volume from the feature size; placement from injectivity and isolation options.
  4. 4Agree success. Water cut, profile change and oil response agreed before pumping.
  5. 5Measure. Response against the criteria; the diagnosis updated by what the well says back.

Conformance treatment before polymer flooding cures severe heterogeneity and de-risks the flood; conformance during polymer injection corrects problems that emerge with time.

Diagnosis is what makes a shut-off pay

+~4,000 bopd

At zero water cut: a Gulf of Suez rigless shut-off and re-perforation built on diagnosis of the rising oil–water contact, US$100,000 under plan.

Egypt, Gulf of Suez, 2017 · Halliburton case

Result reported by the operator and service company in the source below. It is a third-party result, not Streamlines’ own.