Packers, plugs and completion tools
Isolation and repair without a rig where the completion allows it: production and isolation packers, permanent and retrievable bridge plugs, high-expansion through-tubing systems and tubing and casing patches, with Eclipse Well Services.
- Isolation
- Permanent and retrievable packers and plugs
- Gas-tight
- V0-qualified retrievable plugs
- Through-tubing
- High-expansion systems, about 3:1
- Setting
- Slickline, e-line or coiled tubing
APPLICATIONS
Where it is applied
- Zonal isolation of watered-out or depleted intervals
- Tubing and casing leak repair
- Temporary or permanent well suspension
- Velocity-string hang-off on a high-load packer
- Plug-and-abandonment barriers
- Isolation below restrictions with through-tubing systems
Can this zone be isolated, or this leak repaired, without a rig?
Water or gas from one interval, a leaking tubing joint, a failed packer or a well to suspend: the answer is often a plug, a packer or a patch set through the existing completion, placed where the logs say the problem is.
Isolate, repair, suspend
Production and isolation
Retrievable and permanent packers, including high-load packers for velocity-string hang-off.
From cast iron to V0
Cast-iron plugs for permanent or temporary suspension, and V0-qualified gas-tight retrievable plugs.
Through the tubing
Systems of about 3:1 expansion that pass restrictions and set in the casing below.
Repair in place
Tubing and casing patches restoring integrity without replacing the string.
Diagnose, select, set, test
- 1Diagnose. Noise, PLT, caliper or camera evidence shows where the barrier must go.
- 2Select. Barrier class and tool against pressure, temperature, restrictions and how long it must hold.
- 3Set. By slickline, e-line or coiled tubing, with non-explosive electric setting tools where they fit.
- 4Test and record. Pressure-tested and recorded in the well’s barrier register.
Delivered with Eclipse Well Services: rigless intervention, packers, velocity strings and related completion tools.
Related
Name one zone to isolate or one leak to repair.
We reply with the barrier we would set and how we would get it there.
