Downhole camera inspection
See the problem before you fish, mill or pull: high-resolution downhole video, looking down the bore and around the wall, run on e-line, slickline or coiled tubing.
- Views
- Down-view and rotating side-view
- Conveyance
- E-line live; slickline in memory; coiled tubing
- Best in
- Gas-filled or clear-fluid wellbores
- Delivered
- Annotated video, stills and a report
APPLICATIONS
Where it is applied
- FishingThe top of the fish, its orientation and condition before a tool is picked
- Casing and tubing damageCollapse, splits, holes and parted joints
- RestrictionsScale, wax, sand and debris
- Completion componentsNipples, sleeves, mandrels, packers and plugs
- Perforations and screensOpen, plugged or eroded
- Gas wellsWhere water or oil is entering the bore
What exactly is down there?
Fish tops, parted or collapsed tubing, holes, scale and debris, and the state of completion components are usually inferred from tags and logs. A camera run shows them, so the fishing, milling or repair plan is designed on what is there rather than on a guess.
Two views, one decision
Look ahead of the tool
The fish top, the obstruction and the bore ahead, seen before anything is run against them.
Scan the wall
A rotating side view inspects holes, splits, perforations, corrosion and component condition.
Steer the run
On e-line the picture reaches surface live, so the run is steered to what matters; on slickline it is recorded in memory.
With calipers and EPDT
Run alongside multi-arm calipers, EPDT or noise logs, so what is seen is also measured.
Prepare the fluid, then look
- 1Objective and conveyance. What has to be seen, at what depth, and the safest way to get the camera there.
- 2Fluid plan. The camera needs a clear medium: gas wells are ideal; liquid-filled wells are displaced with clear brine or flowed with gas before the run.
- 3Run and record. Down-view to the target, side-view across it, every frame depth-correlated.
- 4Report. Annotated stills and video with a recommendation: fish, mill, patch, isolate or work over.
Visibility depends on the fluid. Opaque oil or mud must be displaced before the run; we confirm the fluid plan at the planning stage, before mobilisation.
Related
Name one obstruction or one damaged well.
We reply with the conveyance, the fluid plan and what the camera will show.
