N₂ tracer gas-lift survey
Where is the lift gas really entering? A measured slug of nitrogen injected with the lift gas and timed back to the wellhead shows the operating point, multipointing and leaks, with no slickline and no shut-in.
- Intervention
- None: a surface operation
- Production
- The well keeps flowing
- Finds
- Injection points, multipointing, tubing leaks
- Verifies
- The gas-lift design and injection rate
APPLICATIONS
Where it is applied
- Wells producing below the design rate
- Suspected operation from an upper unloading valve
- Multipointing between two or more valves
- Tubing or mandrel leaks passing lift gas
- Deviated, slugging or obstructed wells where slickline is risky
- Dual-string wellsThe lift-gas split between strings
Is the gas lift working as designed?
The traditional answer is a flowing-gradient survey on slickline: an intervention, a risk of sticking and fishing, and an inconclusive result when the well is surging. A tracer survey asks the same question from the surface, on the flowing well.
Timing the gas through the well
A measured slug
A small, measured volume of nitrogen is added to the lift-gas line at the wellhead.
Down the annulus, up the tubing
The tracer travels with the lift gas, enters the tubing at each injection point and returns with the produced fluids.
At the wellhead
A fast gas analyser records when the tracer arrives and how it is spread out in time.
Against the well model
Arrival times are matched to annulus and tubing travel times from the well model to locate each entry point and estimate the split.
Model, measure, inject, interpret
- 1Well model. Completion, valve schedule and gas-lift design checked before the survey.
- 2Baseline. Rates, pressures and the lift-gas rate, verified with the clamp-on meter.
- 3Inject and detect. Tracer injected at the wellhead; arrival recorded at the wellhead outlet.
- 4Interpret. Entry depth or depths, the split between them, and any leak path.
- 5Act. Valve change-out, injection-rate change, redesign or the SST, ranked by value.
The lift-gas rate is measured with the clamp-on ultrasonic meter during the survey, so the rate used in the interpretation is measured, not assumed.
Related
Name one gas-lifted well.
We reply with the survey plan and the model we will check it against.