ISO 9001 · 14001 · 45001 certified · EGPC-registered
ENGINEERINGSURVEILLANCE

Surveillance and well-test analysis

Pressure- and rate-transient analysis, fluid characterization, production logging and formation-pressure programmes: the surveillance that keeps the reservoir model honest between studies.

Analysis
PTA, RTA and virtual metering
Fluids
PVT checked, EOS tuned
Logs
PLT and integrity-log interpretation
Pressures
RFT design and analysis

APPLICATIONS

Where it is applied

  • Pressure-transient analysisPermeability, skin and boundaries from build-ups
  • Rate-transient analysisDrainage volume from production data
  • Well-test designDuration and gauges set to answer the question
  • Reservoir pressure trackingDepletion and connectivity
  • Reserves supportDecline and material-balance inputs
  • Surveillance plansWhich wells to test, and how often

SURVEILLANCE PRACTICE

Four kinds of evidence, read together

PTA · RTA · VIRTUAL METERING

Well-test analysis

Log-log derivative diagnosis of permeability, skin, boundaries and drainage volume; RTA extracts kh, connected volumes and EUR from daily data without shut-ins; virtual metering fills per-well rates between tests.

PVT AND EOS

Fluid characterization and EOS tuning

Laboratory PVT checked for consistency before it is trusted; equation-of-state models tuned to CCE, differential-liberation and separator tests; black-oil tables exported simulator-ready.

PLT AND INTEGRITY LOGS

PLT and well-integrity log interpretation

Zonal contributions from spinner, temperature and density passes; water and gas entries and crossflow found; cement-bond, caliper and corrosion logs read against the barrier schematic.

RFT

RFT design and analysis

Stations placed where the objectives are; fluid gradients, contacts and free-water level; vertical and areal communication assessed and depletion mapped per reservoir.

CASE STUDY · ANONYMIZED

Surveillance-led well and reservoir review

Producing-asset operator

SCOPE

Turn scattered well tests, production logs and pressure surveys into one picture of what each well and reservoir is actually doing.

DELIVERED

PTA/RTA on the key wells; EOS retuned to validated PVT; PLT water-entry diagnosis on the problem wells; an RFT depletion map; one ranked intervention and data-acquisition plan.

  • kh and skin per key well
  • EOS matched to lab data
  • Ranked intervention plan

MEASUREMENT TECHNOLOGY

Meters and logging tools put surveillance on measured ground

MPFM

Multiphase flow meters

Three-phase rates without separation: sizing, technology selection, installation support and validation against well tests where test separators are the bottleneck.

CLAMP-ON

Ultrasonic clamp-on measurement

Non-intrusive flow measurement installed without shutdown: flare lines, water systems and allocation gaps metered where spool pieces are impossible.

PLT

Production logging tools

PLT strings run and interpreted by the same team: zonal contribution, water entry and injection conformance feeding straight into the surveillance practice.

DISCIPLINE

Deployment discipline

Every meter specified against duty, validated at installation and wired into the allocation and reporting framework: hardware that serves the dataset.

ENGAGEMENT SPOTLIGHT · ANONYMIZED

The meters that paid for themselves

Multi-station producing operator

SCOPE

Allocation by difference, a two-year test backlog and flare volumes nobody would sign for: every monthly report an argument.

DELIVERED

MPFM and clamp-on meters specified by duty; installation validated against separator tests; meter factors control-charted; every stream wired into one certified dataset.

  • Reconciliation factors converging to 0.95–1.05
  • A defensible flare number
  • Monthly allocation that closes without a meeting

0.95–1.05

Reconciliation-factor band

2 yrs

Test backlog cleared

100%

Streams metered or estimated to spec

1

Certified dataset for all reports

TEST AND METERING CAMPAIGNS

Testing run as operations, not just analysis

CAMPAIGN DESIGN

Questions first

Test objectives, sequence and duration engineered for the questions asked, with PTA-grade shut-ins only where they pay.

FIELD SUPERVISION

Witnessed and verified

Test execution witnessed; separator, MPFM and clamp-on measurements verified in situ; data QC'd before the crew leaves.

ON THE SPOT

Interpretation while rigged

kh, skin, boundaries and AOF read while the spread is still rigged, so extensions are decided on evidence, not habit.

INTO THE DATASET

One campaign, every user

Results reconciled into allocation, IPM models and the reserves database.

CASE STUDY · ANONYMIZED

Field-wide test and metering campaign

Multi-field operator

SCOPE

Clear a two-year well-test backlog and re-anchor allocation in one integrated campaign.

DELIVERED

Risk-ranked test sequence; MPFM and clamp-on meters where separators could not reach; on-site PTA with same-day extend-or-cut decisions; meter factors re-baselined and results reconciled into allocation and the reserves database.

  • Backlog cleared in one season
  • kh and skin per key well
  • Allocation re-anchored

WHERE IT FITS

Measure, analyze, decide, hand over

  1. MEASUREMeters and logging tools from our Production & Technology segment
  2. ANALYZEPTA, RTA, EOS tuning, PLT and RFT interpretation
  3. DECIDEOne ranked intervention and data-acquisition plan
  4. HAND OVERModels, workflows and a trained team stay with you

Name one asset and one question.

The CISS team replies with a scope, the data we would need and the acceptance criteria.

Discuss a surveillance study