ISO 9001 · 14001 · 45001 certified · EGPC-registered
ENGINEERINGRESERVES AND PORTFOLIO

Reserves, FDP and portfolio

From reservoir model to booked reserves: PRMS and SEC estimation, field development plans and economics under Egyptian PSA terms.

Reserves
PRMS and SEC
Ranges
P90, P50 and P10
Economics
Under Egyptian PSA terms
Deliverables
Models on your licences

APPLICATIONS

Where it is applied

  • Reserves and resourcesEstimates under PRMS and SEC rules
  • Field development plansOptions compared and costed
  • Portfolio rankingAssets and projects ranked on value
  • Year-end reportingReserves reconciled against last year
  • Acquisitions and farm-insIndependent evaluations
  • ForesightThe reserves and planning platform set up on your data

RESERVES, FDP AND PORTFOLIO

Estimate, plan, value, schedule

RESERVES

PRMS and SEC

Estimation, classification and reconciliation.

RANGES

Probabilistic ranges

P90, P50 and P10.

DEVELOPMENT

Field development plans

Field development plans and waterflood optimisation.

ECONOMICS

Egyptian PSA terms

Economics under Egyptian PSA terms.

PORTFOLIO

Planning and scheduling

Portfolio planning, rig and activity scheduling.

VALUATION

Assets and projects

Asset and project valuation.

Deliverables: models handed over on your licences, reports that meet the acceptance criteria agreed at the start, and workshops with your team.

THE MODELS BEHIND THE NUMBERS

Subsurface and reservoir work that feeds the reserves

SEISMIC

Interpretation and inversion

Seismic interpretation and inversion.

PETROPHYSICS

Interactive Petrophysics

Petrophysical evaluation on Interactive Petrophysics.

STATIC MODELS

Structure, facies, properties

Static models of structure, facies and properties.

DYNAMIC MODELS

tNavigator

Dynamic simulation and assisted history match on tNavigator.

GEOMECHANICS

Image logs

Image-log and geomechanics studies.

SCREENING

Waterflood, EOR and CO₂ storage

Waterflood, EOR and CO₂-storage screening.

Models are built on platforms we implement and support, so they outlive the study.

WHERE IT FITS

Estimate, plan, value, schedule

  1. ESTIMATEPRMS and SEC reserves with P90, P50 and P10 ranges
  2. PLANField development plans and waterflood optimisation
  3. VALUEEconomics under Egyptian PSA terms
  4. SCHEDULEPortfolio planning, rig and activity scheduling

WHY IT PAYS · PUBLISHED SOURCES

Studies that paid, in Egyptian fields

~7 MMBO

Dynamic STOIIP above the volumetric figure, from an integrated dynamic model that justified a new well.

GUPCO, Nezzazat · Egyptian J. Petroleum 27(4), 2018

10–25 points

Of recovery: scheme selection matters. CO₂ WAG 57% against 32% for waterflood (AEB-3C); peripheral 44.7% against five-spot 33.7% (Bahariya).

Egyptian J. Petroleum 27(4), 2018; Scientific Reports 16, 2026

Published case histories · Egypt first

Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.

Published case histories
Where · whenWhat was donePublished resultSource
Egypt · Nezzazat, Gulf of Suez (GUPCO) · 2018Integrated 3D dynamic model history-matched to RFT and PLT data with a ‘Big Loop’ uncertainty approachDynamic STOIIP ≈ 7 MMBO above the volumetric figure; new well supportedEgyptian J. Petroleum 27(4)
Egypt · AEB-3C, Western Desert · 2018Compositional simulation of CO₂ WAG against continuous injection with NPV sensitivitiesRecovery 32% at end of waterflood → up to 57% with CO₂ WAGEgyptian J. Petroleum 27(4)

Name one field and one decision.

The CISS team replies with a scope, the data we would need and the acceptance criteria.

Discuss a reserves study