DuraLift gas-lift valves
The valves decide where the lift gas enters. DuraLift unloading and operating valves are selected, set and changed out as one job with the gas-lift design, so the well lifts from the depth the design intends.
- Valves
- Unloading and operating (orifice) valves
- Run in
- Side-pocket mandrels, by slickline
- Set from
- The gas-lift design and the well model
- Checked by
- Nitrogen tracer and flowing surveys
APPLICATIONS
Where it is applied
- New gas-lift completionsUnloading and operating valves set from the design
- Valve change-outsLeaking, cut or mis-set valves replaced by slickline
- Wells that multipoint or cannot unload to the design depth
- Falling reservoir pressureThe injection point moved deeper
- Changed water cut, rate or injection pressureValves re-sized
- Wells short of drawdownPaired with the Supersonic Suction Tool
Is the well lifting from the depth the design intended?
A leaking, cut or mis-set valve lets gas in too shallow: the well multipoints, lift gas is wasted and drawdown is lost. The right valves, set at the right pressures, put the gas back at the operating point.
Valves, design and change-out as one job
Unloading and operating valves
Injection-pressure-operated unloading valves, and orifice valves for the operating point.
Spacing and set pressures
Mandrel spacing, port sizes and test-rack opening pressures from the well model.
By slickline
Valves pulled and set in the side-pocket mandrels with no workover.
Prove the result
A nitrogen tracer survey confirms the well lifts from the design point.
Diagnose, design, set, confirm
- 1Diagnose. Where the gas is entering today: tracer survey, pressures and the well model.
- 2Design. Valve type, port size and set pressures for today’s rate and water cut.
- 3Set. Valves calibrated on the test rack, then run by slickline.
- 4Confirm. The well unloaded, and the operating point checked against the design.
Related
Name one gas-lifted well.
We reply with the survey and the design we recommend before any valve is changed.
