Process modelling and simulation
From process data to engineering deliverables: an engineering service built on simulation, not a software licence.
- Models
- Validated on measured plant data
- Deliverables
- H&MB, PFDs, design inputs
- Studies
- Debottlenecking
- Methods
- Steady-state and dynamic simulation
APPLICATIONS
Where it is applied
- Gas processing and treatmentPlant models and optimisation
- Oil separation and stabilisationOperating points checked
- Refining and petrochemicalsUnit studies
- DebottleneckingThe limiting equipment identified
- Engineering deliverablesHeat and material balances, PFDs and design inputs
- EPC supportSimulation behind the design
WHO IT SERVES
Does the plant do what the model says, and where is the bottleneck?
Process models are built and validated against measured plant performance, then used for cases, sensitivities and optimisation of the operating point.
Who it serves
- Gas processing and treatment
- Refining
- Petrochemicals
- Chemical and industrial processing
- Upstream facilities
- EPC contractors
THE SERVICE
Data, model, simulate, deliver
- 1Data. Plant data, compositions, design basis and operating envelopes collected and checked.
- 2Model. Process model built and validated against measured plant performance.
- 3Simulate. Cases, sensitivities and optimisation of the operating point.
- 4Deliver. H&MB, PFDs, equipment design inputs and debottlenecking studies.
WHERE IT FITS
Collect, validate, simulate, deliver
- COLLECTPlant data, compositions, design basis and operating envelopes, checked
- VALIDATEThe model against measured plant performance
- SIMULATECases, sensitivities and optimisation of the operating point
- DELIVERHeat and mass balances, PFDs, design inputs and debottlenecking studies
WHY IT PAYS · PUBLISHED SOURCES
A desktop study that freed plant capacity
~100 t/d
Of LPG unlocked by desktop process simulation, with 56–88 t/d of plant capacity relieved at the Salam gas plant.
Published case histories · Egypt first
Results reported by operators and vendors in the sources listed below. They are third-party results, not Streamlines' own.
| Where · when | What was done | Published result | Source |
|---|---|---|---|
| Egypt · Salam gas plant, Khalda · 2016 | HYSYS study adding a de-ethaniser and de-butaniser for NGL stabilisation | ~100 t/d LPG; 56–88 t/d of plant capacity relieved | Egyptian J. Petroleum 25(3) |
SOURCES
Name one plant and one bottleneck.
The CISS team replies with a scope, the data we would need and the acceptance criteria.