ISO 9001 · 14001 · 45001 certified · EGPC-registered

Wells · Production assurance

Sand management

Optimizing well productivity by managing fluids and sand production across the life of the field — prediction, completion selection, execution, monitoring and remediation as one process.

What we do

Sanding prediction

Geomechanics-based sanding risk versus drawdown and depletion — when the well will make sand, not just whether.

Completion optimization

Screens, gravel packs and oriented or selective perforating traded against productivity, cost and risk.

Execution to prevent or minimize

Job design and execution support for the chosen barrier — or controlled-sand operation where that is the economic answer.

Monitoring

Sand detection and rate-envelope management integrated into surveillance.

Remediation

Workover and remedial design when wells sand up — with the root cause fixed, not just bailed.

Applications

Weakly consolidated clastic reservoirs; high-drawdown wells and late-life depletion; wells cycling on sand-related failures.

What you gain

Maximum productivity inside a managed sand envelope — fewer failures, longer run lives, and completions matched to the rock instead of the catalogue.

More detail

Grain-level grounding

Sanding assessments draw on our petrology bench — grain fabric, cementation and paragenesis — not just log-derived strength.

Case study · anonymized

Sand management review across a sanding-prone field

Clastic-reservoir operator

The question

Wells were cycling between sand-ups and choked-back rates — set the envelope and the completion strategy that ends the cycle.

What we delivered

Geomechanical sanding-risk envelopes per well; completion selection matrix (screens versus oriented perforating) by zone; drawdown management guidance integrated into operations; remediation designs for the chronic offenders.

Outcomes

  • Per-well sanding envelopes
  • Completion matrix by zone
  • Chronic offenders remediated

Share the question. We frame it with you.

A one-page problem statement is enough. A proposal with named experts, deliverables and acceptance criteria follows.

Talk to an engineer