Drilling performance & NPT reduction

Wells are 40–60% of upstream capex. Performance discipline — measured, contracted and learned — is the fastest capital saving most drilling organizations can buy.

What we do

NPT & ILT accounting

Non-productive and invisible lost time measured per well against a clean baseline; top causes attacked through after-action reviews.

Lean well design

Every string and specification challenged against functional requirements — de-gold-plated without touching safety barriers.

Batch & factory drilling

Identical sections repeated back-to-back; BHAs, fluids and programs standardized to ride the learning curve.

Performance-based contracting

Day-rate contracts shifted toward incentives that share NPT savings — the contractor aligned with the barrel.

Real-time optimization

ROP management, drilling-state detection and remote support cutting days per section.

Applications

Development campaigns; rig-line planning across assets; drilling organizations with rising well costs and flat learning curves.

What you gain

15–30% lower well cost and 20–50% NPT reduction are typical ranges for disciplined programs — faster first oil improving both NPV and unit cost.

More detail

Part of the UTC program

This is the drilling lever of our cost-per-barrel program — the same loss-accounting discipline, applied to the rig.

Case study · anonymized

Campaign drilling-performance program

Multi-rig development operator

The question

Bend the campaign cost curve: same wells, fewer days, without touching the safety envelope.

What we delivered

NPT/ILT baseline and per-well loss accounting; lean design review of the standard well; batch-drilling sequence and standardization plan; performance-contract advisory; after-action review cadence that converted each well's lessons into the next well's program.

Outcomes

  • Per-well NPT/ILT accounting
  • Standardized well programs
  • Learning curve managed down