Case study · anonymized
Water-plant debottleneck & quality upgrade
High-water-cut waterflood operator
The question
Lift water capacity and hit reinjection spec without stopping the flood that depended on it.
What we delivered
Plant re-rate with staged debottlenecking; flotation upgrade and polymer program redesigned together; oil-in-water monitoring regime; execution phased against injection demand — capacity up with the flood never starved.
Outcomes
- Capacity debottlenecked live
- OiW spec met & evidenced
- Flood never starved
