ISO 9001 · 14001 · 45001 certified · EGPC-registered

Project engineering

Process & facilities simulation

Plant behavior predicted before capital is committed — steady-state and dynamic simulation on industry-standard platforms, validated by engineers who have commissioned what they model.

What we do

Dynamic simulation of complete systems

artificial gas-lift loops, processing plants and compression modeled together, capturing the composition and flow interactions single-unit studies miss.

LPG recovery studies

extraction economics, product yields, and the shrinkage/makeup-gas balance of taking LPG and condensate out of a closed loop.

Seasonal operating envelopes

plants simulated at summer, maximum summer, winter and transient conditions, so designs work in August as well as January.

Multi-year composition forecasting

propane/butane dilution in recirculating lift gas tracked over five-year production forecasts.

Debottlenecking, flow assurance and FEED support

from opportunity framing through technical assurance of vendor designs.

Applications

Gas plants and separation trains · Debottlenecking · Design verification · Operating-point optimisation

What you gain

Every facility case is proven across the full seasonal envelope — summer, max summer, winter, transient — before it is recommended.

More detail

Platforms & deliverables

Aspen HYSYS and UniSim for process simulation; industry-standard well and network modeling tools. You receive converged flowsheets for every case, scenario comparison matrices, product-yield and gas-quality forecasts, equipment operating envelopes, and a technical note with actionable recommendations — in your preferred environment, documented so your engineers own the models.

Methodology — framed on the commercial question

Scenario matrices are framed around the decision — feedrate cases, bypass options and makeup-gas strategies compared on product yield, lift-gas quality and forecast revenue, not just converged flowsheets.

Case study · anonymized

LPG extraction from an artificial gas-lift cycle — dynamic loop study

Western Desert joint-venture operator

The question

Determine whether LPG and condensate could be extracted from a closed artificial-gas-lift cycle without starving the lift system — and what continuous loop operation does to product recovery over time. A dynamic model of the full loop — LPG plant, compression, gas-lifted wells and separation — evaluating feed cases of 25 and 10 MMSCFD (with bypass blending), lean-gas recompression and makeup-gas balance.

What we delivered

Propane/butane dilution of lift gas quantified across a five-year forecast, with the plant proven at four seasonal operating conditions.

Outcomes

  • 25 / 10 MMSCFD feed cases
  • 5-year dilution forecast
  • 4 seasonal conditions

Share the question. We frame it with you.

A one-page problem statement is enough. A proposal with named experts, deliverables and acceptance criteria follows.

Talk to an engineer