Case study · anonymized
IPM build with system-wide optimization & transfer
Offshore gas-condensate operator
The question
One calibrated model of the production system — and a client team able to keep it.
What we delivered
PROSPER/GAP/MBAL suite built and matched; multi-scenario optimization across operating envelopes; OpenServer reporting automation; five engineers trained on-job through hand-over.
Outcomes
- ±15% match achieved
- System-wide optimization live
- 5 engineers trained on-job
