ISO 9001 · 14001 · 45001 certified · EGPC-registered

Operations consultancy

Unit Technical Cost (UTC) — health check & optimization

Value erodes quietly: nineteen identifiable sources of waste inflate spend while deferment shrinks the barrels. Our structured Unit Technical Cost (UTC) program reverses both sides of the ratio.

What we do

A two-sided ratio

Cost per barrel worsens from both directions — spend rising in the numerator, deferred and lost barrels shrinking the denominator. The program attacks both at once.

19 sources of waste, in four families

Structural & foundational gaps, information & data deficiencies, strategic & portfolio misalignment, and performance & cultural gaps.

Self-inflicted share made visible

NPT, deferment, reactive maintenance, procurement leakage, silo decisions and poor data are measured well by well, order by order.

Exploration & project erosion

Dry-hole loading, FID slippage, reserves write-downs and stranded capacity priced into the same unit-cost picture.

Strategy sets the ceiling

A portfolio operating model, aligned planning horizons, production wedges sequenced by $/bbl added, and capital ranked on consistent value metrics — NPV, IRR, payback, breakeven and unit cost.

Eight operational levers

Eight operational levers deliver it — each mapped to the side of the ratio it moves: Exploration & subsurface; Production operations; Drilling & wells; Maintenance & integrity; Supply chain & contracts; Energy & emissions; Digital & technology; People & organization.

Made to stick

An operational-excellence management system, one KPI tree from boardroom to control room, loss accounting, and deliberate capability and change management.

Applications

Rising cost per barrel · Budget challenge and cost-reduction programmes · Mature assets nearing their economic limit · Benchmarking against peers

What you gain

20–30% of drilling time typically lost to NPT · 5–15% of capacity lost to deferment and downtime · 10–25% opex reduction from structured OE programs. Industry ranges, illustrative of mature upstream assets.

More detail

Methodology — program rhythm

First 90 days: diagnose & mobilize. Months 4–12: execute the levers. Years 2–3: institutionalize and scale — improvement as business-as-usual, not a campaign.

Case study · anonymized

UTC program design & mobilization

Mature-asset operator

The question

Baseline the true cost per barrel and mobilize a program that cuts spend and recovers barrels at the same time.

What we delivered

A cost-per-barrel baseline and loss register mapped to the nineteen waste sources; production-efficiency tracking with daily deferment accounting; early quick wins (logistics pooling, chemical right-sizing, backlog cleanup); and lever owners, a KPI tree and governance rhythm — with a three-year institutionalization roadmap.

Outcomes

  • 19-source loss register
  • 8 levers, each with an owner
  • 90-day mobilization

Share the question. We frame it with you.

A one-page problem statement is enough. A proposal with named experts, deliverables and acceptance criteria follows.

Talk to an engineer