Case study · anonymized
UTC program design & mobilization
Mature-asset operator
The question
Baseline the true cost per barrel and mobilize a program that cuts spend and recovers barrels at the same time.
What we delivered
A cost-per-barrel baseline and loss register mapped to the nineteen waste sources; production-efficiency tracking with daily deferment accounting; early quick wins (logistics pooling, chemical right-sizing, backlog cleanup); and lever owners, a KPI tree and governance rhythm — with a three-year institutionalization roadmap.
Outcomes
- 19-source loss register
- 8 levers, each with an owner
- 90-day mobilization
