ISO 9001 · 14001 · 45001 certified · EGPC-registered

Operations consultancy

Production excellence consultancy

An operational-excellence system for production — efficiency tracked daily, losses recovered weekly, and the discipline embedded so it outlives the consultants.

What we do

Production-efficiency program

Actual versus maximum potential tracked daily; every deferred barrel classified; a weekly loss-recovery meeting that turns accounting into action.

Bad-actor management

The vital few wells and equipment items driving most deferment identified and fixed first.

Well & reservoir optimization

Routine tests, artificial-lift optimization, water shutoff and stimulation — ranked by dollars per barrel added.

Restart excellence & debottlenecking

Standardized startups after trips and turnarounds; low-cost brownfield projects that add barrels at $2–5/bbl.

Embedded, not imposed

Sustained through an OE management system and balanced cost–quality–safety KPIs — flow assurance and chemicals right-sized on data along the way.

Applications

Mature assets with drifting efficiency; operations rebuilding after crew change; fields where deferment reviews list symptoms instead of causes.

What you gain

Production efficiency that trends up and stays audited — losses named, owners assigned, recovery banked in the same ledger the UTC program reports against.

More detail

One operating rhythm

Daily loss review → weekly recovery meeting → monthly capacity governance — the same cadence our deferral and capacity services install, so excellence is one system, not three.

Case study · anonymized

Production-excellence program on a mature asset

Mature-asset operator

The question

Reverse a two-year efficiency slide without capital projects — system and behavior, not steel.

What we delivered

Daily efficiency tracking with loss classification; bad-actor program on the vital few wells; weekly loss-recovery meetings with owners and deadlines; restart standards after trips; an OE management system with balanced KPIs — efficiency trending up within one quarter and audited monthly.

Outcomes

  • Efficiency trending up in 90 days
  • Bad actors fixed first
  • OE system embedded & audited

Share the question. We frame it with you.

A one-page problem statement is enough. A proposal with named experts, deliverables and acceptance criteria follows.

Talk to an engineer