Departmental KPI library

A representative KPI set per department — cascaded from asset value (L0) to frontline measures (L4), balanced across cost, quality and safety, and installed with owners, thresholds and a review rhythm.

What we do

Subsurface

Reserves replacement ratio; Forecast vs actual ±%; Model update cycle time; Acceptance-criteria pass rate. Protects the credibility of every volume and forecast the business plans on.

Wells

Days per 10,000 ft; NPT & ILT %; Lift run life / MTBF; Well cost vs AFE. Protects the 40–60% of upstream capex that wells consume.

Operations

Production efficiency %; Deferral bbl & $/bbl; Injection conformance; Cost per barrel. Protects today's barrels — and the cost of producing them.

Project Engineering

Flare intensity scf/bbl; Energy per barrel; S-curve variance; Metering compliance %. Protects plant capacity, energy spend and regulatory standing.

Digitalization

Data completeness score; Model refresh latency; Prediction hit rate; Automation coverage %. Protects the data foundation every other KPI is computed from.

HSSE

TRIR / LTIF; Barrier health %; Tier 1/2 process safety events; Overdue actions. Protects people, the license to operate, and the asset itself.

Business Management

NPV delivered vs plan; Reserves audit variance; Budget cycle time; Competency gap closure %. Protects the commercial truth of the portfolio and the bench behind it.

Applications

Departmental scorecards · Performance contracts · Management dashboards · KPIs linked to company objectives

More detail

Cascaded, not collected

Each tree starts at asset value and decomposes to the measures a shift supervisor can move — L0–L4 with explicit arithmetic between levels, so a frontline KPI that improves is visible in the value line, and one that doesn't is retired.

Installed with the organization

KPIs land with the organization review and competency assessment — owners named, baselines measured, thresholds agreed, and a performance-review rhythm that keeps the numbers governing, not decorating.

Share the question. We frame it with you.

A one-page problem statement is enough. A proposal with named experts, deliverables and acceptance criteria follows.

Talk to an engineer